Led technical diligence of a CO2 utilization technology for Fortune 100 consumer goods company, providing a scale-up assessment and technoeconomic evaluation
Reviewed FEL2 design for first demonstration scale prototype for carbon capture technology, identifying design changes to generate data for scale-up, simplify design, and improve operability
Secured a US based collaboration partner for a Japanese chemical major enabling a feasibility study for their CO2 utilization technology
As transitional VP Engineering to industrial biotechnology company, led FEL-1 for project to produce 12 M gal/yr SAF and 30,000 ton/yr chemicals ($250 M total project cost).
Partner Project Experience
D3 Energy:
Universal Orlando, FL Status: Under Construction
The world's most advanced theme park ever built will also be powered by floating solar. This is the second project D3Energy has completed for Universal Resort. The theme park is slated to open in May 2025.
Village of Monroeville Reservoir Monroeville, OH
Status: Completed
The Village of Monroeville will soon be host to the largest PV array in the Midwest and one of the largest in the country. This 6+ MW system will be a part of the Village's distribution system, bringing clean energy to the residents of Monroeville.